Reconstruction of 4 railway bridges
A new road overpass
A pedestrian
67 culverts
24 animal crossings
114 utility crossings
The Imisli–Horadiz Railway Project is one of the strategic initiatives undertaken to modernize the railway infrastructure of the Republic of Azerbaijan. The project aims to transform the railway corridor in the southwestern part of the country into a modern transportation route that meets international standards through the rehabilitation and upgrading of the existing railway line.
The scope of the project includes the preparation of the technical and economic feasibility study, design, and cost estimation documents for the reconstruction of the 77-kilometer section between km 65 and km 142 of the existing line. The project envisages improvements to the track geometry, renewal of the railway infrastructure and superstructure, and redevelopment of station facilities. Five station areas have been designed along the corridor: Vətəgə, Xalac, Daşburun, Bəhmənli, and Hacılı.
The railway is designed as a single-track line with a 1,520 mm gauge, based on a design speed of 120 km/h and an axle load of 25 tonnes.
The project includes the reconstruction of four railway bridges and the construction of a new road overpass to replace an existing level crossing. Of the 19 level crossings along the line, five locations will be served by service and control buildings, while a pedestrian overpass is planned within the Daşburun Station area. Based on hydraulic calculations, a total of 67 culverts have been designed, comprising 30 circular and 37 box culverts. In addition, the project provides for 24 animal crossings and 114 utility crossings reserved for future infrastructure networks.
The Imisli–Horadiz Railway Project is one of the strategic initiatives undertaken to modernize the railway infrastructure of the Republic of Azerbaijan. The project aims to transform the railway corridor in the southwestern part of the country into a modern transportation route that meets international standards through the rehabilitation and upgrading of the existing railway line.
The scope of the project includes the preparation of the technical and economic feasibility study, design, and cost estimation documents for the reconstruction of the 77-kilometer section between km 65 and km 142 of the existing line. The project envisages improvements to the track geometry, renewal of the railway infrastructure and superstructure, and redevelopment of station facilities. Five station areas have been designed along the corridor: Vətəgə, Xalac, Daşburun, Bəhmənli, and Hacılı.
The railway is designed as a single-track line with a 1,520 mm gauge, based on a design speed of 120 km/h and an axle load of 25 tonnes.
The project includes the reconstruction of four railway bridges and the construction of a new road overpass to replace an existing level crossing. Of the 19 level crossings along the line, five locations will be served by service and control buildings, while a pedestrian overpass is planned within the Daşburun Station area. Based on hydraulic calculations, a total of 67 culverts have been designed, comprising 30 circular and 37 box culverts. In addition, the project provides for 24 animal crossings and 114 utility crossings reserved for future infrastructure networks.